للاطلاع على رد الحكومة على الاستبيان

كوريا الجنوبية

Get RSS feed of these results

قضايا ومكونات هذه الفئة

مقال Article
4 June 2019
+ English - إخفاء

الكاتب: Forum ASIA

"Defending in numbers: Resistance in the Face of Repression - 2017-2018", 31 May 2019...

المزيد

تقرير report
21 May 2019
+ English - إخفاء

الكاتب: Korea Federation for Environmental Movements and Advocates for Public Interest Law

“Korean CSOs call on Korean Government and corporations to take immediate measures to stop serious deforestation and human rights violations in the palm oil industry”, 20 May 2019...

المزيد

تقرير report
7 May 2019
+ English - إخفاء

الكاتب: International Labour Organization & Eurofund

"Working conditions in a global perspective", 6 May 2019...

المزيد

مقال Article
27 March 2019
+ English - إخفاء

الكاتب: Yosuke Onchi, Nikkei Asian Review (Japan)

"South Koreans ready more wartime labor suits as clock ticks", 20 Mar 2019...

المزيد

مقال Article
25 March 2019
+ Français - إخفاء

الكاتب: Frédéric Ojardias, RFI

« Travail forcé : la justice sud-coréenne ordonne la saisie d’actifs de Mitsubishi », 25 mars 2019...

المزيد

إمتناع عن الرد Non-Response
28 January 2019
+ English - إخفاء
Story
28 January 2019
+ English - إخفاء

On 1 May 2017, six workers were killed and 25 others injured as a result of a crane collision at a Samsung Heavy Industries shipyard in Geoje, South Korea, during the construction of an oil platform for the Martin Linge field off the coast of Norway. ...

القضية الكاملة

رد Response
25 January 2019
+ English - إخفاء

الكاتب: Total

Thank you for giving us the opportunity to respond......

الرد الكامل

رد Response
23 January 2019
+ English - إخفاء

الكاتب: Technip FMC

Total E&P Norge AS, the operator on the Martin Linge Project, contracted with TechnipFMC and Samsung Heavy Industries to provide engineering, procurement, fabrication, transportation, hook-up and commissioning of the topsides of a fixed production...

الرد الكامل

رد Response
18 January 2019
+ English - إخفاء

الكاتب: Equinor

... As stated in the above-mentioned e-mail, Equinor was not leading the construction project at the time of the accident and where thus not permanently present at the Samsung yard. The operator role was managed by Total E&P Norge AS, who had the...