abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

这页面没有简体中文版本,现以English显示

文章

2 十二月 2024

作者:
mining.com

Austria: Lithium project to get fast-tracked without Environmental Impact Assessment

"Critical Metals’ Wolfsberg lithium project to get fast-tracked without EIA"

A decree issued by Austria’s Carinthian state has given Critical Metals a significant boost by waiving the Environmental Impact Assessment (EIA) step for its proposed lithium mine located 270 km southwest of Vienna.

CRML said this decree is an important step on the way to realizing the project and establishing a European battery supply chain for electromobility. The company’s Wolfsberg lithium project represents the first fully permitted spodumene mine on the continent, with first production targeted for 2026/2027.

“This decree makes the Wolfsberg project the first new mining project within the EU that is able to pave the way into the fast-track approval process for new mining projects in the critical minerals sector,” CEO Tony Sage said in a news release. [...] 

The project is being backed by German carmaker BMW, which entered into a long-term lithium offtake agreement in December 2022 and made a prepayment of $15 million to the company earlier this year.

According to CRML, the decree was issued following an audit by official experts from the departments of forestry, nature conservation, geology, hydrogeology, waste management, chemistry, process engineering, water ecology and water management, as well as torrent and avalanche control.

The assessment by the EIA authority covered the entire project on the Koralpe mountain range, where the proposed underground mine operation is situated. Since the above-ground facilities required by the project are less than 10 hectares, the experts concluded that no EIA is required by law. [...]

隐私资讯

本网站使用 cookie 和其他网络存储技术。您可以在下方设置您的隐私选项。您所作的更改将立即生效。

有关我们使用网络存储的更多信息,请参阅我们的 数据使用和 Cookie 政策

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

分析 cookie

ON
OFF

您浏览本网页时我们将以Google Analytics收集信息。接受此cookie将有助我们理解您的浏览资讯,并协助我们改善呈现资讯的方法。所有分析资讯都以匿名方式收集,我们并不能用相关资讯得到您的个人信息。谷歌在所有主要浏览器中都提供退出Google Analytics的添加应用程式。

市场营销cookies

ON
OFF

我们从第三方网站获得企业责任资讯,当中包括社交媒体和搜寻引擎。这些cookie协助我们理解相关浏览数据。

您在此网站上的隐私选项

本网站使用cookie和其他网络存储技术来增强您在必要核心功能之外的体验。