abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

这页面没有简体中文版本,现以English显示

内容有以下的语言版本: English, 日本語

故事

25 二月 2022

Japan: Rainforest Action Network re-submits complaints alleging violation of procurement code in use of timber for Tokyo Olympics and asking company accountability on tropical deforestation in Indonesia; incl. co. responses & non-response

In November 2021, Rainforest Action Network re-filed a complaint to the Tokyo Metropolitan Government (TMG), one of the organisers of the Tokyo 2020 Games, on an allegation concerning violation of procurement code in the use of timber for the Tokyo Olympics. The complaint is based on a new analysis of satellite data, and it seeks for accountability for the destruction of Indonesia's tropical forests.

Six companies were targets of this complaint, including Korindo Group, Sumitomo Forestry, Takenaka Corporation, Toko Electrical Construction, Asahi Kogyosha and Takasago Thermal Engineering.

Regarding the use of tropical timber for the Tokyo Olympics, in May 2018, an NGO report"Broken Promises" that non-certified formwork plywood manufactured by Korindo was used at the construction site of the TMG's newly built Ariake Arena, and that the product had been imported by Sumitomo Forestry. The report points out specific human rights violations committed by Korindo, such as violation of health rights through using fire to clear land.

RAN says that the purpose of the complaint is to provide clear evidence of tropical deforestation to the organisers and to ensure that the facts are included in the organising committee's sustainability report. RAN also recommended that procurement failures be used as a lesson for future procurement policies for public authorities and companies.

Business & Human Rights Resource Centre invited targeted companies to comment on this matter. Responses from Korindo Group, Sumitomo Forestry, Takasago Thermal Engineering and Toko Electrical Construction are attached below. Asahi Kogyosha and Takenaka Corporation did not respond.

企业回应

Korindo Group 浏览回应
Sumitomo Forestry 浏览回应
Toko Electrical Construction 浏览回应
Takasago Thermal Engineering 浏览回应
Takenaka Corporation

没有回应

Asahi Kogyosha

没有回应

时间线

隐私资讯

本网站使用 cookie 和其他网络存储技术。您可以在下方设置您的隐私选项。您所作的更改将立即生效。

有关我们使用网络存储的更多信息,请参阅我们的 数据使用和 Cookie 政策

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

分析 cookie

ON
OFF

您浏览本网页时我们将以Google Analytics收集信息。接受此cookie将有助我们理解您的浏览资讯,并协助我们改善呈现资讯的方法。所有分析资讯都以匿名方式收集,我们并不能用相关资讯得到您的个人信息。谷歌在所有主要浏览器中都提供退出Google Analytics的添加应用程式。

市场营销cookies

ON
OFF

我们从第三方网站获得企业责任资讯,当中包括社交媒体和搜寻引擎。这些cookie协助我们理解相关浏览数据。

您在此网站上的隐私选项

本网站使用cookie和其他网络存储技术来增强您在必要核心功能之外的体验。