abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

这页面没有简体中文版本,现以English显示

企业回应

18 六月 2015

作者:
Snowy Mountains Engineering Corporation (SMEC)

SMEC response

 

Mong Ton Hydropower Project:

 

The proposed Mong Ton Hydropower Project is located in Myanmar. The objective of the Project is to improve both the capacity and reliability of electricity throughout Myanmar. If the Project proceeds, the hydropower plant will produce more than 34 billion KW hours of electricity annually. Electricity generated will first meet local demands, and surplus electricity will be sold to neighbouring countries, providing a revenue stream for the Government to invest in the local economy.

 

SMEC’s Role on the Project:

 

SMEC has been engaged as an Independent Technical Consultant responsible for undertaking an Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) for the Project. SMEC is collecting and reporting the facts, both positive and negative, from a neutral perspective. It is not SMEC’s role to provide recommendations as to whether the Project should proceed. The findings of the EIA/SIA will be presented to the Government of Myanmar, who will decide (with other sources of information) whether to proceed with the Project.

 

SMEC’s aim is to conduct an EIA/SIA process that is inclusive, constructive and transparent. Stakeholder consultation is an essential element of the process, and the objective of our team is to provide a balanced perspective of the Project and encourage stakeholders to actively participate in the consultation process. Disruption to the EIA/SIA process has the potential to adversely affect local communities, as their genuine concerns may not be able to be documented. Contrary to media reports, SMEC has tried to engage with local Civil Society Organisations on numerous occasions, with limited success. Our EIA/SIA team will continue to present invitations to stakeholder groups to discuss the details of the Project at a mutually convenient time and place.

 

As the EIA / SIA consultation process for this project is one of the first to be conducted to international standards in Myanmar, the Project is attracting a great deal of scrutiny. SMEC has invested in the skills development of local employees to ensure they understand the basis of an objective EIA/SIA process and are carrying it out in line with best-practice.

 

SMEC’s Position on Bribery & Corruption:

 

SMEC’s policies expressly prohibit bribery in all of our business dealings, which we define as giving or receiving an undue benefit (including payments and gifts) to influence behaviour and obtain commercial advantage. This prohibition applies to parties who deal with others on behalf of SMEC. There has been no breach of these policies on the Mong Ton Hydropower Project.

 

时间线

隐私资讯

本网站使用 cookie 和其他网络存储技术。您可以在下方设置您的隐私选项。您所作的更改将立即生效。

有关我们使用网络存储的更多信息,请参阅我们的 数据使用和 Cookie 政策

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

分析 cookie

ON
OFF

您浏览本网页时我们将以Google Analytics收集信息。接受此cookie将有助我们理解您的浏览资讯,并协助我们改善呈现资讯的方法。所有分析资讯都以匿名方式收集,我们并不能用相关资讯得到您的个人信息。谷歌在所有主要浏览器中都提供退出Google Analytics的添加应用程式。

市场营销cookies

ON
OFF

我们从第三方网站获得企业责任资讯,当中包括社交媒体和搜寻引擎。这些cookie协助我们理解相关浏览数据。

您在此网站上的隐私选项

本网站使用cookie和其他网络存储技术来增强您在必要核心功能之外的体验。