Истории со связанными запросами на ответы ? We sought responses from Mahenge Liandu Graphite Project to the allegations raised in these stories. Find out more about our Company Response Mechanism.
News with associated allegations
Топ связанных проблем
Топ связанных стран
Mahenge Liandu Graphite Project has been referenced in news articles and reports on our website.
Упоминания компании (статьи, отчеты, новости и т.д.)
Штаб-квартира компании
Упоминания компании (статьи, отчеты, новости и т.д.) в конфликтных регионах
Штаб-квартира компании в конфликтных регионах
The Mahenge Liandu Graphite Project is a high-grade, long-life, open-pit mining project located in the Morogoro region of Tanzania, about 482 km southwest of Dar es Salaam. It is primarily owned and being developed by Australian-based Black Rock Mining Limited and Armadale Capital Plc. Project Overview
- Location: Ulanga District, Morogoro Region, Tanzania.
- Developers: The project has been associated with both Armadale Capital Plc and Black Rock Mining Limited in separate but nearby developments within the Mahenge region. Black Rock Mining holds 84% ownership of its specific Mahenge project, with the Tanzanian government holding a 16% stake.
- Mine Type: It is an open-pit operation, which is a key factor in its projected low operating costs and low strip ratio.
- Resource: The project boasts one of the world's largest high-grade JORC-compliant flake graphite resources, with Black Rock's estimate at 213 million tonnes at a grade of 7.8% Total Graphitic Carbon (TGC).
- Mine Life: The current mine plan for Black Rock's project forecasts an initial operating life of 26 years.
- Production: The project is planned to be developed in stages, aiming to produce a high-purity graphite concentrate, with potential output reaching up to 340,000 tonnes per annum (tpa) in its final phase. The concentrate purity can reach up to 99.1% TGC.
Current Status and DevelopmentsAs of late 2024 and early 2025, the project has made significant strides towards production:
- Financing: Black Rock Mining has secured substantial financing commitments, including a $179 million boost from African financial institutions, and a separate US$50m funding approval from POSCO, one of the largest ex-China anode producers.
- Permits: All key government agreements and permits, including environmental approvals and a 10-year mining licence, are reportedly in place.
- Timeline: First production is expected approximately 24 months from the Final Investment Decision (FID).
The project is strategically positioned to supply high-quality graphite to the rapidly growing electric vehicle (EV) battery market, offering a source outside of China for Western supply chains