abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeblueskyburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfilterflaggenderglobeglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptriangletwitteruniversalitywebwhatsappxIcons / Social / YouTube

이 페이지는 한국어로 제공되지 않으며 English로 표시됩니다.

Mahenge Liandu Graphite Project

  • 채굴
  • 탄자니아

  • Mahenge Liandu Graphite Project

기업과 인권 센터에서 ? 이 섹션은 센터에서 기록한 기업 행동에 대한 간략한 스냅샷입니다. 우리는 학대 혐의를 기록하고, 기업 응답, 소송 프로필, 기업 문제를 해결하는 옹호자에 대한 공격을 기록합니다.

해당 없음

인권옹호자에 대한 공격

해당 없음

소송 프로필

관련 응답 요청이 있는 스토리 ? 우리는 다음 보도에서 제기된 혐의에 대해 Mahenge Liandu Graphite Project로부터 답변을 요청 했습니다. 기업 응답 메커니즘에 대해 자세히 알아보세요.

관련 혐의가 있는 뉴스

Ulanga, Tanzania: When graphite mining threatens livelihoods and rights of Indigenous people

이 기사에는 1개의 혐의가 포함되어 있습니다.

관련 있는 국가

Mahenge Liandu Graphite Project has been referenced in news articles and reports on our website.

기업 언급 (기사, 보고, 뉴스 등)

기업 본사

분쟁 지역의 기업 언급 (기사, 보고, 뉴스 등)

분쟁 지역의 기업 본사

The Mahenge Liandu Graphite Project is a high-grade, long-life, open-pit mining project located in the Morogoro region of Tanzania, about 482 km southwest of Dar es Salaam. It is primarily owned and being developed by Australian-based Black Rock Mining Limited and Armadale Capital Plc. Project Overview

  • Location: Ulanga District, Morogoro Region, Tanzania.
  • Developers: The project has been associated with both Armadale Capital Plc and Black Rock Mining Limited in separate but nearby developments within the Mahenge region. Black Rock Mining holds 84% ownership of its specific Mahenge project, with the Tanzanian government holding a 16% stake.
  • Mine Type: It is an open-pit operation, which is a key factor in its projected low operating costs and low strip ratio.
  • Resource: The project boasts one of the world's largest high-grade JORC-compliant flake graphite resources, with Black Rock's estimate at 213 million tonnes at a grade of 7.8% Total Graphitic Carbon (TGC).
  • Mine Life: The current mine plan for Black Rock's project forecasts an initial operating life of 26 years.
  • Production: The project is planned to be developed in stages, aiming to produce a high-purity graphite concentrate, with potential output reaching up to 340,000 tonnes per annum (tpa) in its final phase. The concentrate purity can reach up to 99.1% TGC.

Current Status and DevelopmentsAs of late 2024 and early 2025, the project has made significant strides towards production:

  • Financing: Black Rock Mining has secured substantial financing commitments, including a $179 million boost from African financial institutions, and a separate US$50m funding approval from POSCO, one of the largest ex-China anode producers.
  • Permits: All key government agreements and permits, including environmental approvals and a 10-year mining licence, are reportedly in place.
  • Timeline: First production is expected approximately 24 months from the Final Investment Decision (FID).

The project is strategically positioned to supply high-quality graphite to the rapidly growing electric vehicle (EV) battery market, offering a source outside of China for Western supply chains