Article
Case Study: BP and the Casanare Project, Colombia
With high oil production levels, and with a backdrop of a nationwide-armed conflict, BP decided it was time to improve and streamline the Tri-Sector Partnering model it had been applying since 1993, with the advisory support of BPD/NRC. The goal was to optimise the use of resources, so that that their operations generate long-term sustainable, non-oil dependent social and economic development in the Casanare region.